Abstract

The aim of this research is to optimise the utilization of third runway in Soekarno Hatta International Airport by giving recommendation based on calculation and simulation of runway capacity. The flight schedule data in Soekarno-Hatta International Airport was taken from flightradar24.com for duration of 1- 6 January 2020. The calculation of the runway capacity uses time space analysis method and simulation in BlueSky ATM Simulator. The highest runway capacity of 44 flights per hour is reached when the runway operates as take-off only or landing-only configuration. The simulation is conducted for 3 scenarios: 2 runways configuration, 3 runways configuration and 3 runways configuration with modification. The log data of simulation is analysed using Python programming to know the separation for every pair of flights and ensured that the minima distance due to wake turbulence is fulfilled. The recommendations are runway 07L/25R and 06/24 operates as segregated parallel operation by installing ILS on runway 06/24, extending NP2 and NP3 taxiway for increasing the capacity and reducing the runway incident probability. The results from extending the taxiway are the operation of runway 06/24 will not disturb runway 07L/25R operation, the runway capacity will increase by 60%, and the utilization of third runway will increase by 55%.

Highlights

  • Air Transportation is one of the common modes transportation that used today, especially for archipelago countries like Indonesia

  • Soekarno-Hatta International Airport will handle almost 100 aircraft movements per hour, and it is beyond the capacity

  • Based on literature survey above, analytic method is more suitable for this research because we focus on runway capacity and using static variables

Read more

Summary

Introduction

Air Transportation is one of the common modes transportation that used today, especially for archipelago countries like Indonesia. Soekarno-Hatta International Airport will handle almost 100 aircraft movements per hour, and it is beyond the capacity. For this reason, there will be a delay during peak hour. The following are several factors which are affecting the capacity of the runway[14]: 3.1 Runway Occupancy Time Runway occupancy time (ROT) is how long the aircraft is occupyng the runway. It is an important factor which related to runway capacity. In Indonesia, ROT is regulated by DGCA as follows [15]

Objectives
Methods
Findings
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.