Abstract
Along with the operation of the Toboali Substation, studies needed to improve reliability. The ground disturbance that occurs in a feeder can cause a sympathetic trip in another feeder and effect the blackout of Toboali system. This is due to the choice of loop operating patterns on feeders and buses that tend to be close together. From the results of simulation and optimization of directional ground relay coordination it was found that before the improvement of energy not supplied due to sympathetic disturbances on the Toboali system was 51,261 MWh/year and after the improvement of energy not supplied became 21,170 MWh/year. Expected this optimization of protection coordination improves reliability and reduces the energy not supplied due to sympathetic disturbances that occur in Toboali substation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.