Abstract

This paper examines the optimization of an existing two-phase anaerobic digestion process using grass silage as a feedstock. The system comprises 6 leach beds connected to an upflow anaerobic sludge blanket (UASB). The existing system produced 305 L CH(4) kg(-1) VS added at an overall retention time of 42 days (6 leach beds emptied and fed sequentially every 7 days in series). The desired improvements were a reduction in retention time with increased methane production. It was noted in the existing system that biogas production and COD levels fell off in the last 2 days of each 7-day cycle. Thus the first change involved reduction in retention time to 30 days (6 leach beds fed sequentially every 5 days in series). This lead to a slight improvement in methane production (310 L CH(4) kg(-1) VS added). The second change was effected by separation of flows to the first stage (leach beds) and the second stage (UASB) through addition of an extra pump to optimize leaching. This led to an increase in CH(4) production (341 L CH(4) kg(-1) VS). The overall improvement from the existing system was an increase of 11.8% in methane production and a reduction in size or retention time of 40% (42 days decreased to 30 days retention time).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.