Abstract
The failure of safety critical petroleum assets (SCPA) is often accompanied by devastating safety consequences. The conceptualization, design, and construction of SCPA need to integrate factors that will maintain the asset’s lifecycle integrity. In this paper, a risk-based assessment of a case petroleum pipeline asset in Nigeria was used to examine the project conceptualization phase of an asset. The paper adopts a case study method, semistructured interviews, and field observations, and drew on pipeline failure data. Key managerial issues that need to be considered in project conceptualization for SCPA were identified. These issues include consideration for risk receptors and the need to assess organizational capabilities with respect to owning, operating, and regulating SCPA. This paper contributes theoretically by providing a performance-based learning framework for the conceptualization of new SCPA.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.