Abstract

The leaching procedure of post-precipitated aluminium phosphate sludge with dilute phosphoric acid was developed. The leaching offers a route to recover both critical phosphorous from sewage sludge and the metal used in precipitation. Using phosphoric acid as leaching solution makes it possible to continue the recovery process without the need to remove chloride or sulfate anions. The optimization of the leaching was based on experimental three-level-four-variable central composite face-centered design. The four variables included were acid concentration, volume of acid, temperature and time of leaching. The leaching was conducted for dewatered and water-containing sludge (total solid content 3–4%) and for both second-order regression models were obtained. For water-containing sludge optimal conditions for leaching are solid to liquid ratio (S/L) 400 gL-1, a temperature of 60 °C and a leaching time of 6 h. For the dewatered sludge, optimal leaching is attained when S/L ratio 119 gL-1 with 2 M acid is used at a temperature of 20 °C. The obtained results enable the developing of full-scale process where phosphate in the sludge is refined to phosphorous acid and metal used in sludge production recycled back to precipitation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.