Abstract

An optimization of the air pollution control (APC) residue washing process was carried out to minimize the release of chloride and heavy metals. Taking into account economic parameters such as the consumption of water and reaction time, the best relation found was a S/L ratio of 1/3 during 1 h. At a laboratory scale and according to the values obtained for chloride and heavy metals, the APC residue is classified as non-special according to Catalonian Regulations (Spain). Moreover, the pH of the solution, when MgSO 4 is added during the washing process, may be controlled by the formation of gypsum. In these conditions, the concentration of heavy metals will decrease as a consequence of the formation of their respective insoluble hydroxides. Therefore, the counter-current batch washing process with the addition of small amounts of MgSO 4 is revealed as an economically feasible treatment of the APC residue. This washed residue is ready to be used as secondary material or to be landfilled safely.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.