Abstract

Technical shrinkage is shrinkage caused by impedance in generation equipment or transmission equipment to the distribution network so that there is energy loss. There are several technical shrinkage problems at PT. Perusahaan Listrik Negara (PLN) especially in Customer Service Unit (ULP) Lhokseumawe City and for now the cause is still unsolved, because this technical shrinkage problem will harm and have an impact on consumers and PLN itself. The purpose of the study was to optimize technical shrinkage in the distribution network to reduce energy losses that occurred during the electrical power distribution process in the distribution network of PT. PLN (Persero) ULP Lhokseumawe City. This study uses the help of Electrical Transient Analyzer Program (ETAP) software to simulate the power flow so that the depreciation value that occurs is obtained, then re-load adjustment is carried out to simulate again to determine the change in the depreciation value obtained after load adjustment. The results of the ETAP simulation show the depreciation value that occurred before the load adjustment was made by 76.7 kW after the depreciation load adjustment was adjusted to 59.6 kW. This means that this technical shrinkage can be suppressed by changing the feeder operation pattern and voltage drop value in accordance with the limitation provisions set in SPLN 72:1987.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call