Abstract
Demands for the infrastructure and transportation in the world keep increasing with matching production of steels of higher strength and better ductility. They are produced largely with BF‐BOF/EAF‐LF/RH‐CC systems as the main stay. Optimization of the system is mandatory to stably maximize premium yield of steels at higher productivity, while keeping the CO2 emission, waste evolution, raw material/energy consumption, and production cost at their minimum. Problems inherent to the unit processes involved are addressed. Integration of the processes into an optimized system is discussed with emphasis placed on hot metal pretreatment, productivity, and process versus quality issues for the sustainable near future of steel industry.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.