Abstract

During concrete dam construction, optimizing temperature measurement scheme prevents dam cracking due to temperature fluctuation in concrete dam leads cracking produce. In paper, the temperature operation optimizational model was established from three aspects (Variance selection, object function and constraint condition).Additionally, the temperature optimizing model was implemented in reality dam construction to analysis temperature measurement and gain conclusion which post-temperature measurement is much better than pre-cool measurement.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call