Abstract

In a construction environment, project scheduling is an essential tool to measure the success of all projects. This research paper will use project crashing of Activity to decrease the project completion schedule through the CPM method of time-cost trade-off and to minimize project cost. It includes linear programming with the aid of Microsoft Excel Solver to determine the result. And at the end of the research paper, it will show the impact of crashing the activities for the HVAC mechanical installation in a project for both normal and crash time, which displays that the selected Activity that had been crashed generated an increase of 9.8 % total cost from the total project cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.