Abstract

Based on the data, there were still shortages of production from year to year and demand wereunstable in motorcycle chains manufacturer in Indonesia. To overcome these problems, the purpose of this research was to make production planning and inventory control consisting of forecasting, aggregate planning, Master Production Schedule (MPS), and Material RequirementsPlanning (MRP). Forecasting used the additive decomposition method (average of all data), multiplicative decomposition (centered on moving average), and winter method (additive and multiplicative). Aggregate planning used chase strategy, level strategy, and transportation model. Moreover, MRP used lot for lot, Economic Order Quantity (EOQ), and Periodic Order Quantity (POQ) methods. The test shows several results. First, the best forecasting is additive decomposition (average of all data) with MAD value of 3.033,57, MSE with 13.590.490,and MAPE with 10,083%. Second, the best aggregate planning is transportation model with the total cost of Rp7.708.398.390,00. Last, the best MRP method is the lot for lot with total cost Rp7.162.567.653,00.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.