Abstract

This study aims to evaluate the effectiveness of maintenance techniques on 20 kV Power Circuit Breakers (PMTs) using the Research and Development (R&D) method. Key performance variables assessed included contact resistance, PMT synchronism, and insulation resistance. Findings revealed that contact resistance for all phases was below 100 µΩ, indicating optimal connectivity. Synchronism testing showed time differences of 0.7 ms during opening and 1.05 ms during closing, both within acceptable limits. Furthermore, insulation resistance exceeded the 20 MΩ standard, confirming the insulation's integrity. These results suggest that regular maintenance using precise measurement techniques ensures the continued reliability and safety of MV electrical delivery systems. Highlights: Rising Electricity Demand: PT PLN (Persero) faces increasing electricity needs. Advanced Protection Solutions: Innovative equipment addresses conventional limitations. Research Insights: Findings ensure safety and reliability in medium voltage systems. Keywords: Contact Resistance, Insulation Resistance, PMCB, Synchronism Testing

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.