Abstract
The problem addressed here is scheduling the shutdown for refueling and maintenance of nuclear power plants. The models have up to four reactors requiring of the order of five shutdowns each over a five-year time horizon. The resulting mixed-integer program is large and complex with interesting structure. We show good results using a mixed-integer optimizer taking advantage of a strong linear programming formulation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.