Abstract
AbstractU‐shaped automated container terminals (ACTs) represent a strategic design in port infrastructure that facilitates simultaneous loading and unloading operations. This paper addresses the challenges of scheduling multiple types of equipment, such as dual trolley quay cranes (DTQCs), automated guided vehicles (AGVs), double cantilever rail cranes (DCRCs), and external trucks (ETs) in U‐shaped ACTs. This paper proposes a mixed integer linear programming model for optimizing the multiple equipment scheduling, aiming to minimize container completion time and AGV waiting time simultaneously. This paper customizes a hybrid genetic‐cuckoo optimization algorithm (HGCOA) with double‐point crossover and Lévy flight Cuckoo search strategies. Extensive numerical results show that the proposed HGCOA outperforms the benchmark genetic algorithms in terms of solution quality and computational time while significantly improving efficiency without substantial sacrifices in solution quality compared with the exact solution method. Overall, this study presents a promising solution for enhancing coordination and operation efficiency in U‐shaped ACTs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Computer-Aided Civil and Infrastructure Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.