Abstract

<p>This contribution addresses the optimisation of monitoring and decision-making criteria regarding the future use of structures and the related implementation in modern guidelines. A summary of the state-of-practice reveals deficiencies that are addressed by prospective guidance for the anticipated updates of standards, providing a general methodology to obtain cost-optimal decisions using limit state design, probabilistic reliability analysis and cost estimates. The implementation of a draft guideline and the corresponding risk-based approach are illustrated in a full-scale case study dealing with the roof of a stadium located in Northern Italy. The results demonstrate the potential of using monitoring systems and probabilistic reliability analysis in order to support decisions regarding safety measures such as snow removal, or temporary closure of the stadium.</p>

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call