Abstract
In advanced manufacturing, optimizing mixed-model synchronous assembly lines (MMALs) is crucial for enhancing productivity and adhering to sustainability principles, particularly in terms of energy consumption and energy-efficient sequencing. This paper introduces a novel approach by categorizing sequence-dependent setup times into bipartite categories: workpiece-independent and workpiece-dependent. This strategic division streamlines assembly processes, reduces idle times, and decreases energy consumption through more efficient machine usage. A new mathematical model is proposed to minimize the intervals at which workpieces are launched on an MMAL, aiming to reduce operational downtime that typically leads to excessive energy use. Given the Non-deterministic Polynomial-time hard (NP-hard) nature of this problem, a genetic algorithm (GA) is developed to efficiently find solutions, with performance compared against the traditional branch and bound technique (B&B). This method enhances the responsiveness of MMALs to variable production demands and contributes to energy conservation by optimizing the sequence of operations to align with energy-saving objectives. Computational experiments conducted on small and large-sized problems demonstrate that the proposed GA outperforms the conventional B&B method regarding solution quality, diversity level, and computational time, leading to energy reductions and enhanced cost-effectiveness in manufacturing settings.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.