Abstract

This work compared one new design of Air separation using Linde process for medical air production with existing plant using exergy and process cost analyses. Hyprotech System Simulator (HYSYS) software was used in simulating the process plants and Microsoft Excel was used for exergy, energy and process cost analyses. Annual profit was used as fiscal index for comparism with existing plant design. Exergy analysis of Linde air separation process showed that exergy efficiency of the existing plant (base case) was 3.23 kJ/h while that of the improved plant when the valve was replaced with a turbine (Case 1) was 11.65 kJ/h. Also, the process cost analysis showed that the annual profit for the base case was 48,818,463 ($/yr) while that of the improved case was 50,485,051 ($/yr). Replacing the valve with the turbine in the Linde air separation process could greatly give a better air separation process in terms of high purified medical air with greater annual venture profit.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.