Abstract

Performance in the construction industry is wrought with challenges and owners often are victim to cost and schedule overruns, particularly on high profile projects that are large, complex, and risky. Alternative project delivery methods and techniques are continually being developed and implemented by buyers of construction services to address these problems. The Best Value Business Model (BVBM) has been rigorously tested and shown to improve project performance via its three-phased approach to project delivery. BVBM increases performance throughout the construction project lifecycle by utilizing value-based selection processes, pre-contract planning methodologies, and performance measurement systems. The objective of this research is to provide a detailed case study of BVBM application on a design-build project to deliver a highly complex research facility with tight schedule and budget thresholds. The implementation process is discussed in detail and project results are provided and analyzed to demonstrate the ability of BVBM to improve project performance. Special attention is paid to the ability of BVBM to optimize project cost and schedule performance through the application of a value-based selection methodology, a pre-contract preplanning period, and a weekly risk management system.

Highlights

Read more

Summary

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.