Abstract

The construction of buildings invariably involves time and costs, and disruptions impact ongoing construction projects. Crisis situations in management strategies, structural confusion, and financial miscalculations often arise due to misguided decision-making. This article proposes a method that combines the learning of Bayesian Networks and heuristic techniques to optimize decision-making processes in construction scheduling. As an innovative approach in order to enhance construction management, the functioning of biological, molecular, and physical objects and nervous systems is considered, applying bionic features to mimic their efficiency and precision, thereby optimizing construction processes and improving coordination and decision-making. Bayesian Networks are used for probabilistic analysis, and heuristic methods guide quick decision-making. The results demonstrate the effectiveness of Bayesian Networks and heuristic methods in data analysis and decision-making in construction engineering. The developed algorithm can be successfully applied to both erecting and planning construction projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.