Abstract

The depletion of fossil energy and the deterioration of the ecological environment have severely restricted the development of the power industry. Therefore, it is extremely urgent to transform energy production methods and vigorously develop renewable energy sources. It is therefore important to ensure the stability and operation of a large multi-energy complementary system, and provide theoretical support for the world's largest single complementary demonstration project with hydro-wind-PV power-battery storage in Qinghai Province. Considering all the multiple power supply constraints, an optimization scheduling model is established with the objective of minimizing the volatility of output power. As particle swarm optimization (PSO) has a problem of premature convergence and slow convergence in the latter half, combined with niche technology in evolution, a niche particle swarm optimization (NPSO) is proposed to determine the optimal solution of the model. Finally, the multiple stations' coordinated operation is analyzed taking the example of 10 million kilowatt complementary power stations with hydropower, wind power, PV power, and battery storage in the Yellow River Company Hainan prefecture. The case verifies the rationality and feasibility of the model. It shows that complementary operations can improve the utilization rate of renewable energy and reduce the impact of wind and PV power's volatility on the power grid.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.