Abstract

The polysilicon production process has significant potential to be made adjustable, and actively changing its production schedule to participate in grid dispatch can effectively alleviate the pressure on the power supply and balance demand while promoting renewable energy consumption. Considering the complex inter-coupling relationship between the sequential requirements and adjustable potential of polysilicon production, this paper analyzes the electricity consumption characteristics of various stages of a polysilicon production process that uses the improved Siemens method as its primary approach to production. The interaction between the polysilicon production process, equipment, and materials is modeled through the state–task network method, and the production timing requirements are transformed into constraint expressions. An optimized scheduling model that includes the production’s sequential requirements within a time-of-use electricity pricing context is established. Our analysis shows that the proposed model can formulate a feasible production plan with the lowest power purchase cost for polysilicon plants while meeting the production’s sequential requirements and product order demands.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.