Abstract
Severe operational problems of sediment deposition have frequently occurred in stormwater sewer systems in Shanghai city due to the flat topography of the area and serious illicit connections. To control sewer sediment and its subsequential problems, optimized operation plans were proposed and an innovative performance assessment method was developed. Simulation results demonstrated that, through changing the way of pump operation and installing necessary actuators in the system, the optimized operations, especially batch intermittent intercept plan, effectively improved the flow velocity in the entire system in dry-weather condition. In conclusion, the optimized operation is an innovative idea for improving the performance and solving the problem of sediment deposition in the sewer system in Shanghai, China.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.