Abstract
This paper studies an Integrated Energy System (IES) and the application of Hydrogen Compressed Natural Gas (HCNG) and Power to Gas (P2G) equipment in IES. Based on the C&CG algorithm, this paper establishes a two-stage robust optimization(TRO) model of the system operating in uncertain environments. Introducing HCNG and P2G equipment into IES can improve the system’s ability to accommodate renewable energy, reduce system operation cost and reduce interaction fluctuation between the system and the main grid. Robust optimization can effectively reduce the risk of system operation in uncertain environments and improve the stability of system operation. Under the compensation of the real-time market, the financial performance of the robust optimization model is better than the deterministic optimization model according to the numerical simulation. This study is helpful to the study of the operation and scheduling of IES in remote areas with weak power system infrastructure and abundant renewable energy resources.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.