Abstract

This paper addresses the midterm preventive maintenance outage scheduling problem of thermal generating units which is becoming increasingly important due to the aging of power generation fleet. In this context, a novel midterm preventive maintenance outage scheduler is proposed based on decision tree and mixed integer linear formation which explicitly considers the thermal units aging momentum in terms of failure rate. This allows the system operators to determine the thermal units' maintenance outage window based on the cost/benefit analysis of preventive maintenance tasks while optimizing the time interval between consecutive maintenance tasks. Additionally, the division of the year-long midterm horizon into several time blocks in the proposed model provides a unique opportunity for parallel processing and computational saving. The proposed approach is tested on the IEEE Reliability Test System (IEEE-RTS). The results presented reveal the accuracy and efficiency of the proposed approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.