Abstract

In this study, four different types of power generation plants harboring a Load Dispatch Center was created and each of these production plants in order to determine the set values by using mixed integer programming algorithm optimization software by creating a simulation was performed. These 4 Natural Gas Combined Cycle Power plant one, and one Gas Turbine Power Plant, one of them, and one Fuel-Oil Turbine Power Plant is a coal-fired thermal power plant. There are a total of 15 units at these plants. To increase diversity and realized in order to create a more useful optimization methodology is based on the units. Turkey reflects the conditions of this optimization software for future use as an alternative to carbon emissions oversee a section was added. Thus, carbon emissions are taken into account the effect of the set value of the net electricity production could be observed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.