Abstract
In this study, four different types of power generation plants harboring a Load Dispatch Center was created and each of these production plants in order to determine the set values by using mixed integer programming algorithm optimization software by creating a simulation was performed. These 4 Natural Gas Combined Cycle Power plant one, and one Gas Turbine Power Plant, one of them, and one Fuel-Oil Turbine Power Plant is a coal-fired thermal power plant. There are a total of 15 units at these plants. To increase diversity and realized in order to create a more useful optimization methodology is based on the units. Turkey reflects the conditions of this optimization software for future use as an alternative to carbon emissions oversee a section was added. Thus, carbon emissions are taken into account the effect of the set value of the net electricity production could be observed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Uluslararası Muhendislik Arastirma ve Gelistirme Dergisi
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.