Abstract

Undercutting method is now adopted in prosperous cities or complex areas with all kinds of surroundings, but this method has great risks. Undercutting method includes many ways, it is important to choose a rational one in one certain project. Based on the design and the construction, this paper analyzes the CRD method, the PBA method, the Middle Hole Construction method and the Double Side Drift method which were widely used in China. The paper takes the safety, the cost and the construction time into account, using Comprehensive Evaluation and Fuzzy Mathematics to make sure that the chosen construction method is the most feasible one. Through analysis we could ensure that the construction of the Metro engineering is safe, economic and quick.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.