Abstract
By theoretical calculations, numerical simulation and field monitoring methods to analyze the stress distribution and the extent of damage of coal pillar determine a reasonable size is about 10m, can improve the recovery rate of coal resources, and to ensure the roadway stability. 10m pillar coal resources compared with the previous 20m pillar recovery increased by about 5.5%, and created tremendous economic benefits of the mine.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.