Abstract

Southwest China power grid (SCPG) and central China power grid are planned to be unsynchronized by using back-to-back voltage source converter based high voltage direct current transmission between Chongqing and Hubei power grids. After asynchronous interconnection, the proportion of hydro in installed capacity is about 70%. In other words, the SCPG is a typical hydrodominant power system. Due to the negative damping effect of governors of hydrogenerators, there is a serious risk of ultralow-frequency oscillation (ULFO) in the range of 0.05 Hz. In this paper, optimization strategies of governor for hydropower unit are presented to eliminate ULFOs. First, the control mode is selected based on comparing damping characteristic of different control modes of governor. Then, a relevant coefficient index is proposed to select sensitive generators of ULFO. Afterward, PID parameters of governor are optimized based on a new performance criteria considering the damping characteristic of governor. Finally, optimization strategies are presented and applied to SCPG. Simulation results show effectiveness and practicability of the proposed measures, which have been adopted and will be implemented before the asynchronous interconnection.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.