Abstract
Solidification process of 13.5t P91 steel ingot with different riser heights were simulated by software and predicted the distribution of shrinkage cavity. The simulation results showed the shrinkage cavity in the precedent ingots is much deeper. The simulation results is agreement well with experiment results. Therefore, the riser height was designed by solidifation simulation and verified by experiments and the results showed that optimized riser height can eliminate shrikage cavity and improve the quality of steel ingot.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.