Abstract

Focus on a-400m level stoping in a gold mine, the ANSYS numerical software was used to study the stope structural parameters in upward drift cut-and backfilling mining methods. First, according to engineering experience, the design of stope structural parameters was obtained. Then the stoping process of both the first drift and the second drift was simulated by the numerical software. The vertical maximum displacement and the vertical maximum stress were selected as evaluation indexes for analysis. The result shows that the third project, whose drift width is 4 m and layer height is 3 m, have the best effect with the less displacement and stress compared with other projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.