Abstract
This paper considers a parallel system with a random number of units according to a Poisson distribution. The fracture of an aircraft fuselage with multiple site damage serves as a real world application for this problem. The mean time to failure is obtained. Using this result, an optimal number of units and replacement time for the system which minimize the expected cost rates are derived analytically, and numerically, when the failure time has a Weibull distribution. It is of interest that these results also give good approximations to those of the system with a constant number of units. Further, similar discussions for a scheduling problem of a job with random working times are made, when a parallel system is provided.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.