Abstract

This paper obtains function index system of excavation by FAST method and introduces fuzzy comprehensive evaluation to estimate function index system. By analyzing function system of the excavation obtains the evaluation method for excavation design cost, proposing new evaluation standard for excavation design. At last establishing value engineering (VE) optimization model for excavation design, and put it into engineering practice to prove that the model is convenient and practical.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.