Abstract
Alloy steel materials are predominantly used in the manufacturing of headers in thermal power plant boilers. Generally the hand hole pipe and dish end component are provided in the header for the inspecting the inner surface of the header. Conventionally the welding of dish end with hand hole pipe of the header is carried out using manual GTAW welding process for root pass and manual SAW welding process for filler passes which is a time consuming process. Thus it is substituted with a semi-automatic welding process i.e., STT- root pass followed by the pulsed GMAW for filler passes through a newly designed welding positioner. This semi-automatic welding process optimizes the cycle time and increases the productivity rate. Also the new welding process – STT and P-GMAW is established by following optimization technique of Taguchi’s orthogonal array method and ensuring the weld quality performance through X-Radiography, mechanical tests impact test and hardness test.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Research in Engineering and Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.