Abstract
Semarang City is working on constructing a Material Recovery Facility (MRF) in various urban villages to reduce the waste that enters the Jatibarang Landfill. However, the construction of MRF is not optimal. MRF Purwosari still functions as a container without waste processing. By projecting waste generation for the next ten years, the results of optimization planning are processing waste into RDF, redesigning MRF covering an area of 1,571 m2 with an investment cost of IDR 1,602,837,997 and an operational cost of IDR 307,741/ton/day. The NPV value was Rp.4,836,965, EIRR 12%, and BCR value of 1.81.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Jurnal Presipitasi : Media Komunikasi dan Pengembangan Teknik Lingkungan
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.