Abstract

The China Spallation Neutron Source project Phase-II aims to deliver 500 kW beam power to the spallation target. To meet the beam power requirement, an RF-driven negative hydrogen ion source with an external-antenna has been developed. In order to optimize the beam transmission through the radio frequency quadrupole and the downstream linac, the low energy beam transport line needs to be carefully studied and the transverse emittance is focused in this paper. With computational simulation and experimental verification, the emittance growth caused by nonlinear magnetic fields of the solenoid and the residual magnetic fields at the measuring position has been carefully analyzed. The measurement uncertainty of the double-slit scanner has also been quantitatively estimated. Using the same plasma-beam boundary setting, the beam extraction system is also optimized with particle tracking simulation in CST PARTICLE STUDIO.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.