Abstract

In the extensive literature dealing with the machining economics problem, the optimization of the multistage production system is rarely discussed, and when so it is considered mostly in terms of the Failure Replacement Strategy. However, when analysing this problem, the possibility of using the Opportunistic or Integrated Replacement Strategies also arises. In this work, we minimize the expected cost per unit under three different tool replacement strategies: Failure Replacement, Opportunistic Replacement and Integrated Replacement. For the first strategy, we show that the optimal solution is obtained using a one-dimensional search algorithm. For each of the other two strategies, we develop approximate models that are studied using simulations. These models appear to be very efficient.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.