Abstract

The cold-end system of steam turbine is an important auxiliary system in thermal power plant, its operating mode has a direct impact on the output of the unit and auxiliary power. This paper uses an optimization analysis method to calculate the cold-end system of a 1000MW ultra-supercritical(USC) unit, and establishes a cold-end optimization system by using VB6.0 for a domestic ultra-supercritical unit, which provides an online guide for the operator by calculating the condenser. The results show that this system can provide some guidance for unit operation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.