Abstract
A scheduling problem arising in factories producing large building blocks is modelled applying optimization techniques. The application is a shipyard workshop producing prefabricated keel elements. The objective is to maximize the number of building blocks produced in the factory during a certain time window. The solution combines a Guided Local Search heuristic with Fast Local Search techniques. A final discussion explains the additional real-life issues arising in the industrial application and how firm-specific constraints can be conveniently considered by the model.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.