Abstract
An increasing concern among water resources managers is the search for ways to improve reservoir sizing techniques. A simple technical and scientifically based technique is the sequent peak method, which has been widely disseminated, but presents limitations with respect to the length of the available data series. The objective of this study was to propose modifications to the sequent peak method to overcome the limitations related to the impossibility of associating the reservoir storage capacity with return periods different from the length of the data series. Storage capacities were estimated for every year, considering gauge stations located in the Urucuia River Basin, based on the sequent peak method. In order to associate such capacities with a frequency factor (return period), the Gumbel distribution was applied to the estimated storage values. This association with return periods which differ from the number of years in the data series showed great applicability
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.