Abstract
In this research, the scheduling Batch process had done for minimizing the processing time and the highest equipment efficiency of the ethanol production process. Aspen Plus program was used to perform the mass and balances in the steady state part, and Aspen Batch Process Developer program was used to schedule batch parts of the process. The production process from oil palm empty fruit bunch has the ethanol capacity of 9,200 kg per day. The raw materials are oil palm empty fruit bunch 47,000 kg per day. There are four production schedules: one hydrolysis tank and one fermentation tank, four hydrolysis tanks and a fermentation tank, one hydrolysis tank and four fermentation tanks, four tanks of hydrolysis and four tanks of fermentation. This can reduce time consumption in one production cycle and less cycle time
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.