Abstract

This article illustrates the optimization of project duration by network planning technology in the progress of project management process when the calculated duration cannot meet the target schedule requirements. It proposed an innovative method which can reduce the project time with minimum direct cost increment. Different optimization ways have been studied and corresponding cost increments have been analyzed. The results indicate that the method is capable of using minimum cost to control the project schedule within the planning period.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.