Abstract

Electricity generation from renewable energy sources (RES-E) is planned to increase significantly within the coming decades. However, due to uncertainty about the progress of necessary infrastructure investments, public acceptance and cost developments of renewable energies, the achievement of political plans is uncertain. Implementation risks of renewable energy targets are challenging for investment planning, because different shares of RES-E fundamentally change the optimal mix of dispatchable power plants. Specifically, uncertain future RES-E deployment paths induce uncertainty about the level and the steepness of the residual load duration curve and the hourly residual load structure. In this paper, we show how uncertain future RES-E penetration levels impact the electricity system and try to quantify effects for the Central European power market. We use a multi-stage stochastic investment and dispatch model to analyze effects on investment choices, electricity generation and system costs. Our main findings include that uncertainty about the achievement of RES-E targets significantly affects optimal investment and dispatch decisions. In particular, plants with a medium capital/operating cost ratio have a higher value under uncertainty. We find that this technology choice is mainly driven by the uncertainty about the level rather than about the structure of the residual load. Furthermore, given larger investments in plants with medium capital/operating cost ratio under uncertainty, optimal investments in storage units are lower than under perfect foresight. In the case of the Central European power market, costs induced by the implementation risk of renewable energies are rather small compared to total system costs.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call