Abstract

Household shopping activities in Indonesia have increased by 51% percent since the pandemic period (BPS, 2022). The increase affects household ingredients in packaging. PT X produces various types of packaging for household needs with various size specifications through the make to order system has experienced an overload of production quantity resulting in a delay of 36.19%. PT X needs to conduct problem analysis and production planning to improve ontime delivery. Problem analysis is carried out by direct observation methods and management interviews. Production planning is carried out by dividing and prioritizing tasks using the Hungarian optimization method and Multi Attribute Utility Theory

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.