Abstract

The project was conducted in a high quality steel wire manufacturing company with the production capacity of over 120,000 tones/annum. The wire drawn from the high speed wire drawing (KOCH) machine is fed as the raw material for BEKEART (zinc coating galvanization) furnace. The problem faced by the company is the variability in the amount of input to the furnace, which results from the breakdowns occurring on the KOCH machine resulting in low production. Apart from its speed, KOCH machines have other advantages due to their automation by which they can be set as per the requirements and different parameters of the company. It can be concluded that any downtime in the process occurring at the KOCH machine adversely affects the productivity of the BEKEART furnace, as a result of which the total production on this line suffers and hence the profits of the company. A simulation study was done with the objective of increasing the throughput and ensuring smooth product flow through the system by finding the optimum arrival batch size.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.