Abstract

SUMMARY Introducing a concept of ‘ production speed ’ as a decision variable, a production model with variable (speed-dependent) production time and cost for producing a product item was constructed. Optimization analysis was mode on a single-item, multistage production system in an attempt to determine the optimal production speeds for all stages and the optimal cycle time. For a case of multiple-item production, an optimal job sequence and the optimal production speeds for all jobs were analysed, such that the total flow time was minimized as a primary objective and, in addition, the total production cost was minimized as a secondary objective.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call