Abstract

SUMMARYMixed cycle length operation has been recommended for networks where individual intersections process considerably different traffic volumes. The signals to operate at lower or higher cycle lengths are determined heuristically. This paper demonstrates that the use of mixed cycle lengths as given by the heuristic is inferior to operation under a common cycle length. This contradicts findings in earlier studies, and the difference in conclusion is due to the use of updated optimization methodology. A procedure for incorporating the allocation of mixed cycle lengths into the global optimization of all signal timing variables by a genetic algorithm is proposed. The mixed cycle length timing plans obtained from this procedure are an improvement over those determined heuristically. Mixed cycle length operation is found to be of a more limited application than indicated in previous studies. Copyright © 2012 John Wiley & Sons, Ltd.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.