Abstract
JCB India Ltd. is a construction equipment manufacturer. Every production day, required materials in manufacturing of equipments produced at their Ballabhgarh Plant are brought in by Milk Runs, or from warehouse inventory. This paper is an attempt to minimize cost of Milk Runs for JCB India Ltd. The system is mathematically modeled to minimize total time for milk runs, followed by formulation and solution of a 'Bin- packing problem' to fit requisite number of trips into minimum possible number of trucks.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.