Abstract

Time delays and cost overrun are still a "scourge" in construction projects. The most important factors that cause these two risks are ineffective project planning and scheduling, and inaccurate quantity taking off. Thus, it is most appropriate to carry out mitigation since the project planning period. With the fact of increasing stadium construction in various countries, with iconic and futuristic design, and containing national pride, must be a serious concern so that the risk of time delay & cost overrun can be reduced. Because stadiums are like that usually involve a complex structural system, complicated installation technique with strict network diagrams. The M-PERT & BIM 5D - Based Quantity Take Off method has the potential to mitigate and minimize this risk. This study, with the RII simulation, reveals the critical success factor for applying the potential of this method, especially in stadium structural work. These factors can become a serious concern for construction practitioners, especially in Indonesia, who are and will build stadium projects. Keywords: Structure; Stadium; M-PERT; BIM 5D; RII.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.