Abstract

The luffing-tower crane (T/C) is a key facility used in the vertical and horizontal transportation of materials in a tall building construction. Locating the crane in an optimal position is an essential task in the initial stages of construction planning. This paper proposes a new optimization model to locate the luffing T/C in the optimal position to minimize the transportation time. A newly developed mathematical formula is suggested to calculate the transportation time of luffing T/C correctly. An optimization algorithm, the Harmony Search (HS) algorithm, was used and the results show that HS has high performance characteristics to solve the optimization problem in a short period of time. In a case study, the proposed model offered a better position for T/C than the previous heuristic approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.