Abstract

To produce the steel with phosphorus less than 0.007% (mass percent), the double slag process has been optimized in basic oxygen furnace (BOF). Dephosphorization and decarburization arc performed in sequence in the same converter. Deslagging is conducted twice, each at the end of dephosphorization and decarburization, by tilting the BOF. Production was tested in a 180 t BOF. Mass percent of phosphorus in steel at BOF blow end has been made to as low as 0.0042% after optimizing operational parameters. Factors affecting dephosphorization performance were studied. Before intermediate deslagging, dephosphorization is determined by the mass transfer of phosphorus from metal/slag interface to bulk slag phase rather than equilibrium thermodynamic conditions. After intermediate deslagging, dephosphorization is determined by the equilibrium thermodynamic conditions such as slag composition and temperature.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.